Florida Department of Transportation for the complete redesign of this major urban interchange, including
reconstruction of the ramps and widening of SR 826 to six lanes in each direction. The project also included eight new bridges and a
noise wall. Controlling factors in the design were the close proximity of the Coral Gables Canal and the Tamiami Canal, plus the limited
available right-of-way for stormwater treatment and disposal. A complex stormwater system was developed that combined infiltration swales and
trenches, a stormwater network, exfiltration trenches, retention basins, and overflow to the canals within the project