UM SS Master Plan Update


Project Description

University of Miami Main Campus Sanitary Sewer Master Plan Update (2017-2022) consisted of an evaluation of existing conditions to identify and prioritize recommended improvements to the existing on-campus sanitary sewer system. A prioritization analysis was performed considering areas of high priority (improvements needed due to system needs that require more immediate upgrades) and areas of lower priority (improvements that can be phased or performed over long-term future upgrades). The study provides an actualization of on-campus developments, evaluate existing sanitary system conditions, and recommend sanitary sewer system upgrades and improvements to meet current demands, as well as future projected system capacity demands. Projections beyond this 5-year period through 2025 were provided for planning level estimations of anticipated campus developments and needs. (Coral Gables, FL)

  • Client:

    University of Miami