Fort Lauderdale-Hollywood International Airport (FLL)

Terminal 5 – Fort Lauderdale-Hollywood International Airport (FLL)

As Program Manager for JetBlue Airways’ new Terminal 5, Corradino is overseeing a 230,000-square-foot domestic terminal designed to serve up to 5 million passengers annually. The facility includes five gates, modern check-in areas, advanced baggage handling systems, elevated walkways, and convenient links to nearby terminals and parking structures—delivering a seamless passenger experience from curb to gate.

FIS Facility – FLL Terminal 4

A $115 million expansion of FLL’s international arrivals facility increased capacity to 1,800 passengers per hour and introduced U.S. Customs and Border Protection’s “One Stop” protocol. With upgraded baggage operations, improved passenger flow, and enhanced inspection technology, the project set a new standard for international processing at Fort Lauderdale-Hollywood International Airport.

Concourse G Gate Expansion – FLL Terminal 4

This transformative $450 million redevelopment replaced a six-gate concourse with a modern 14-gate terminal, complete with new fueling systems, security screening, and airline support areas. The project utilized CMAR, Design-Bid-Build, and Design-Build delivery methods to successfully complete construction while maintaining uninterrupted airport operations.

Runway 10R-28L Expansion – FLL

Corradino provided full program management for the runway expansion at FLL, extending Runway 10R-28L from 5,276 to 8,000 feet to support larger aircraft and international service. A critical component of this project was constructing elevated runway segments over U.S. 1 and the Florida East Coast Railway—preserving traffic flow and operational continuity for the region.

Terminal 4 Apron Reconstruction – FLL

A complete reconstruction of the Terminal 4 apron involved full demolition and replacement of airside pavement. The project also included new taxi lanes, upgraded utilities, stormwater improvements, and careful integration with existing fueling infrastructure—executed with minimal impact to gate operations.

Want to see more of our projects?