Broward County Adaptive Signal Control Corridors

This smart corridor initiative involved the design and integration of adaptive signal systems along Hallandale Beach Boulevard and US-1. Work included controller upgrades, high-resolution detection, and performance-based signal timing integrated into the County’s Transportation Management Center — reducing congestion and improving response to real-time demand.

Want to see more of our projects?